Labor flow Control

When creating a Labor flow, I want to ensure the next step cannot performed until the previous step is completed. Is there a way to accomplish this?

We have handled that in the past in Work Instructions using the Require at Loc? field.

@paulv:

Robin is correct, if you add a requirement to the work instructions like requiring a signature, then it will prevent the work order from moving to the next location until that requirement is met.