BOM Cost API returning blank values – need correct endpoint for labor & material cost

Hello Cetec Support Team,

We are using the Cetec ERP API to pull BOM part cost data into our system, but we are getting blank/empty responses for cost fields even though the values are clearly visible inside Cetec.

Here is what we are seeing:

  1. When we call the API for parts like HSLB-6/4-30T1 and HSLB-6/4-30, the fields ‘cached_cost_details’ and ‘unit_cost’ come back empty.

  2. Inside Cetec’s BOM rollup screen for HSLHSLB-6/4-30, we can see the actual values:

    • Labor: $86.39
    • Overhead: $40.24
    • Material: $681.01
    • Total Rollup: $807.64
  3. Because the API returns blank, our Excel report is showing 0 for Material Cost, Labor Cost, and Overhead Cost for these parts.

Affected part numbers (examples):
HSLB-6/4-30T1, HSLB-6/4-30, HSLB-6/4-25, HSLB-6/4-20, HSLB-6/4-15B2T2

What we need your help with:

  1. Please tell us the correct API endpoint to retrieve the itemized cost breakdown (labor, material, overhead) for a BOM part.

  2. Does the ‘cached_cost_details’ field need any setting to be turned on in Cetec before it will return data via the API?

  3. Could you share a sample API request and the expected response showing labor, material, and overhead costs for a part?

We believe the data is there in the system — we just need the right API to access it. Please let us know what we should use.

Thank you for your help. We look forward to your response.

Best regards
Pravin