BOM Cost API returning blank values – need correct endpoint for labor & material cost

Hello Cetec Support Team,

We are using the Cetec ERP API to pull BOM part cost data into our system, but we are getting blank/empty responses for cost fields even though the values are clearly visible inside Cetec.

Here is what we are seeing:

  1. When we call the API for parts like HSLB-6/4-30T1 and HSLB-6/4-30, the fields ‘cached_cost_details’ and ‘unit_cost’ come back empty.

  2. Inside Cetec’s BOM rollup screen for HSLHSLB-6/4-30, we can see the actual values:

    • Labor: $86.39
    • Overhead: $40.24
    • Material: $681.01
    • Total Rollup: $807.64
  3. Because the API returns blank, our Excel report is showing 0 for Material Cost, Labor Cost, and Overhead Cost for these parts.

Affected part numbers (examples):
HSLB-6/4-30T1, HSLB-6/4-30, HSLB-6/4-25, HSLB-6/4-20, HSLB-6/4-15B2T2

What we need your help with:

  1. Please tell us the correct API endpoint to retrieve the itemized cost breakdown (labor, material, overhead) for a BOM part.

  2. Does the ‘cached_cost_details’ field need any setting to be turned on in Cetec before it will return data via the API?

  3. Could you share a sample API request and the expected response showing labor, material, and overhead costs for a part?

We believe the data is there in the system — we just need the right API to access it. Please let us know what we should use.

Thank you for your help. We look forward to your response.

Best regards
Pravin

This topic was automatically closed 90 days after the last reply. New replies are no longer allowed.