Like in the traceability report.
Our customers would really like to have the lot codes on the packing slip.
//H
Like in the traceability report.
Our customers would really like to have the lot codes on the packing slip.
//H
That would fall under custom document work, which we can do for 1 hour billable engineering time.
If its a stock line, we would grab the lot code from the bin that its picked from. If its a build line, we would generate/pull the lot code from what is on the line’s serials page. With your general process, that would mostly be stock orders, correct?
Please let us know if you approve of this quote.
Thanks,
Cetec ERP Support Team
We have decided to just add the traceability report to our packingslip instead of adding the lot codes to the packingslip.
So we will pass on the quote this time.
Thx
//H