It looks like the “Labor” call out in the Rollup section is no longer there. Has there been a change?
Example 783190 or AT753193.
Thank you,
Pat
It looks like the “Labor” call out in the Rollup section is no longer there. Has there been a change?
Example 783190 or AT753193.
Thank you,
Pat
To clarify the labor is not listed on the old version. Was this a change by design?
Still looking for a response.
I am going to escalate this to engineering. Thank you for bringing this to our attention. Please use the new version as that has the labor cost.
Thanks,
Cetec ERP Support
Thank you,
Engineering has a fix for this that should go out to you in the next couple of weeks.
Thanks,
Cetec ERP Support