I am trying to get a filtered down MRP into Shop CQ instead of everything. When I filter it down into CeTec based off not being a BOM and a buy by date and submit it to be sent over to Shop CQ, Shop is getting everything loaded into the system. Part of the issue with that is we have builds all the way into Q3 of 2026 in that which I do not need to buy for yet, and I don’t want the noise involved as well. How do I filter it down in CeTec MRP so Shop CQ doesn’t see all demand for over a year along with assemblies. I know you can export it into an Excel file as well, but there should be a more streamline way of doing this.