Multi level BOM not driving material demand in MRP

I have created a Subassembly BOM and included that has 2 P/N’s. I created the Top level BOM that includes the Subassembly and then a few other raw materials. MRP is telling me that I have a demand for the Subassembly but it is not showing me the demand for the components that make up the Sub OR the materials needed to build the Top level assembly. I’m not sure what I am missing. I watched the video on how to produce a multilevel BOM and I done it that way.

Please advise

Hello - I am following up on this issue as I have not figured out what I am doing wrong. Please advise and if I need to provide any more information just let me know.

thank you

Hi,
I’ll try to give some hints on what might be missing.
I am going to assume that you have created a workorder for the part in question.
I am also going to assume that you have the Maint ->Build Defaults
set to either Follow or always build.

But did you create a work order for the subassembly when you created the order?


i.e did you click the link depicted in the picture above?

If you did all that, then I do not know what might be wrong

(sorry for using two diffrent parts in my example).
//H