Is there a way to have the schedule bar be 1 full bar instead of these little segments?
I apologize for the delay on this. The reason those are in separate segments for the schedule on the gantt chart is each of those segments are different locations at different times. Is there a specific use case for having all of these segments in one line?
Thanks,
Cetec ERP Support
Look at the surface grind center.
There are two bars on the 29th, both at the same location.
I am trying to understand why they have two different bars on the same day if 1 ends at 1 pm and the other starts at 2 pm why do they not continue?